Redwire secures DARPA VLEO contract

On November 19, Redwire Corporation announced that it has been awarded a $44 million phase 2 contract to advance the Defense Advanced Research Projects Agency’s (DARPA) Otter Very Low Earth Orbit (VLEO) mission to demonstrate the world’s first air-breathing spacecraft and advance next-generation orbital capabilities. The phase 2 contract provides funding to complete manufacturing and deliver the spacecraft to launch for the mission, which leverages the design of Redwire’s SabreSat platform.

“VLEO represents an exciting new frontier for defense, intelligence, and communications missions. Through our work with DARPA, we are accelerating the development of cutting-edge capabilities that will define the future of this domain,” said Tom Campbell, president, space missions at Redwire. “With Otter and our SabreSat platform, we are delivering higher-performance missions at lower altitudes: improving sensor perception and proximity to targets of interest, increasing revisit, reducing latency, and redefining mission resilience.”

Otter is built on Redwire’s U.S.-built SabreSat Orbital Drone, a new breed of satellite designed for performance, endurance and cost-effectiveness in VLEO. The spacecraft will showcase innovative software and hardware systems designed to extend spacecraft life and enhance performance in challenging low-altitude orbital environments.

Source: Redwire

Don’t miss out — become a paid subscriber to IC News, and lock in subscription rates at 2025 prices. You’ll get full access to breaking news from across the IC contracting space, with new articles each weekday.